Stars Over the River Drin
Overview
After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.
Cast
Details
| Status: | Released |
|---|---|
| Release Date: | 1978-04-25 |
After the foreign specialists leave, engineer Lulëzim is left in charge of building the Fierza Hydroelectric Power Station.
| Status: | Released |
|---|---|
| Release Date: | 1978-04-25 |